Lontra HR · Working template

Knowledge handover acceptance record

Decide whether one task package can be accepted for its stated scope and support arrangement.

Use this worksheet with a fictional example first, then adapt it to your organization’s process. Keep personal or confidential information in your authorized systems.
  1. Specify the task package and acceptance conditions before reviewing the evidence.
  2. Have the receiving colleague test the sources and access through their approved role.
  3. Use an approved practice case that covers a normal decision and a relevant exception.
  4. Record observations and unresolved dependencies separately, with a responsible owner.
  5. Make the acceptance decision explicit and review the package after the first suitable work cycle.

Click a cell to edit it locally. Print or save as PDF to keep your completed copy. Changes are not sent to a server.

Download a blank HTML copy

Readiness checkEvidence to inspectStatus and next owner
Task and scopeNamed responsibility, next work event and accepting ownerReady / action required / untested
Current sourceOpen the approved instruction and confirm owner and versionEvidence reference and resolution owner
Task cardCompare steps and decision cues with the current instructionConflict or missing step to resolve
Successor accessOpen required systems and sources in the receiving roleAccess gap, owner and agreed support
Normal practice caseExplain and attempt the approved sequenceObserved gap and retest condition
Exception caseIdentify the stopping point and authorization routeUnresolved boundary and responsible role
Support after transferCheck current contact, availability and fallbackNamed support commitment
Acceptance and reviewRecord proceed, supported proceed or defer, with reasonAccepting owner and first-cycle review
   
   
   

Prepared by Lontra HR Editorial · 10 November 2026 · Editorial review copy. Filled examples, where present, are fictional and demonstrate the method.

Read the guide on Lontra HR